From:                              route@monster.com

Sent:                               Friday, April 08, 2016 12:09 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 PMP

 

This resume has been forwarded to you at the request of Monster User xapeix03

Emad Mofarej Kouchaki 

Last updated:  11/01/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Houston, TX  77077
US

Mobile: 8322799502   
emadPMP@gmail.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Planner

Resume Value: hc5g9pnsbim7wnxq   

  

 

Emad Mofarej Kouchaki, PMP

Permanent resident (Green card holder) of the U.S.

1415 Eldridge PKWY Apt2637  Houston TX 77077, (832)279-9502 , EmadPMP@gmail.com

Synopsis

EPC (Engineering, Procurement & Construction) Project Planner/Scheduler with 9 years of experience and proven ability of teaming with internal and external stakeholders to execute projects on time and within budget. Experience with project scheduling, controls and planning, Early Conceptual Schedule/FEL/FEED, engineering, procurement, construction, installation and pre-commissioning on on-shore and offshore Oil and gas and other industries mega-projects with a combined value of $5B. Well-versed in  WBS, CPM, PERT, Resource estimation and Resource loading, Performance Curves, cash flows and EVM project management techniques, PMI PMP holder, and a seasoned Microsoft Project and Primavera P6 user and administrator (9 years).

 

Experience

Project Planner/ Scheduler, Faradast Energy Falat Co.                                        Sep. 2011 – Sep. 2015

Deputy of Project planning and scheduling management for the Star-Oil Bandar Abbas gas condensate refinery. The project includes Refinery  a 300km feed pipeline and seawater intake and had a total estimated cost of $4.5B. Duties included:

·               Participate In schedule workshops, defining Scope of work (SOP), Establishing project Work Breakdown Structure(WBS) and collecting WBS dictionary and work package definitions, Master schedule, Detailed Scheduled, Estimating resource needs and creating cost and resource loaded schedules, Schedule baselines, s-curves and cash flows and look ahead plans

·               monitor performance on sub-projects, facilitating sub-contractors schedules reviews, integrate the contractors' schedules into a high-level master schedule and evaluation and provide resolution to management team with help of Primavera P6.

·               Assisting Project Manager by tracking critical activities and responsible for smooth interface with contractor's project controls team on carrying out required updates & revision (300 vendors, 8 EPC contractors and 5 consultants) and maintenance of detailed construction schedule. 

·               Creation of multi-level interactive periodic and ad-hoc work performance reports using Primavera EPPM, and in-house PMIS (S-curves, Cost & Schedule variance and EVA forecasts, Look ahead plans, Trend analysis). Reports included Cost & Schedule variance and EVA reports, forecasts.

·               Evaluate and monitor deliverable schedules, and analyze milestones and interdependencies for conformance with contractual obligations and performing schedule analysis to come up with alternatives to minimize exposure to claims and avoid time extensions and provide alerts if necessary.

·               Conduct weekly meetings with project teams to validate progress of completed work and future activities in order to update project schedules

·               Work closely with Project Risk Specialist  to provide analyses and evaluation on schedule impacts of risks

·               Setup, and administration of Oracle’s Primavera P6 EPPM hosting sites, and train planning team, project and senior management and client how to use it effectively

Key achievement: Received employee of the year award.

 

Project Planner/ Scheduler , Cost Engineer, Takhsis Pars Engg. & Mgmt. Co                 Feb. 2009 - Sep. 2011

Project planner and scheduler and cost engineer for two EPC projects (CERRO AZUL cement project, Hamedan waste water treatment plant and Chabahar water treatment plant) with a total estimated cost of $300M. Duties included:

·               Gathering information from the project team to develop Master schedule, Work Breakdown Structure (WBS), Level 5 Project Plan (Primavera P6), administer rolling wave planning, recovery schedules, project resource allocation and manpower loading.

·               Forensic evaluation of contractor schedules, impact/delay analysis, estimating costs of delays for approval and assist in claims resolution.

·               Estimating activity resource and cost and project cost and schedule baseline for cost monitoring and schedule performance benchmarking.

·               Developing weekly, monthly and custom progress and status reports to track and communicate project progress based on critical path and earned value.

·               Conducting Risk analysis and what if analysis and highlight risk impacts to project schedule and cost and calculate.

·               Reviews and analysis project invoices to ensure accuracy and timely submission.

·               Providing look a-head schedule to ensure readiness to progress with future works.

Key achievement: Assisted in development of in-house tool used to analyze project key performance indicators of project progress.

 

Project Scheduler, Rahbaran Co.                                                                                           May 2008 - Feb. 2009

Project Planner/Scheduler for two projects (Gachsaran Hospital EPC project and Sanandaj Hoojestan Complex construction Project) with a total estimated cost of $100M. Duties included:

·               Working with project manager to review schedule and focus/prioritize resources to reach the targeted time lines (Using Primavera P6).

·               Identify Critical Path Activities (CPA) and near critical activities and advise project team accordingly, integrating subcontract schedules with master schedule.

·               Establishing project scope, Work breakdown structure(WBS), master and detailed schedule and project cost and schedule baseline to create control account to monitor cost and schedule.

·               Prepare and distributing weekly, biweekly and monthly status reports to Project Manager and stakeholders.

·               Report on project milestones to project manager to ensure timely completion of project requirements.

·          

 

Project scheduler, rasin Construction Co.                                                                Jun. 2006 - May 2008

Project scheduler for Iran Railways construction program comprising of over railroad & construction project. Duties included:

·               Tracking sub-projects compliance with master plans, defining project milestones, monitoring achievements, and delivering recommendations on project schedules utilizing Primavera P3 and P6 and MS Project server.

·               Identifying projects risks and potential issues and propose/analyzed corrective and preventive actions and contingency plans.

·               Structuring comprehensive project schedules incorporating variance reports, resource leveling, and project updates.

·               Establishing and managing stakeholder engagement and communication.

·               Preparing various project reports and presentations on a monthly and ad-hoc basis, (profiling baseline & working schedules, critical path items, project & program schedule variances, expenses variances and project earned value, etc.).

 

Education

·              MS Financial Engineering, Raja University, Qazvin, Iran (Feb 2010) Received highest (3.7/4) GPA among 2010 graduates.

·               BS Industrial Engineering, Azad University, Tehran, Iran (Aug 2006)

 

Certificates

·               PMP (Project Management Professional) 29 Sep 2015

·               Integrated Management system internal audit, NIS Academy, 2015

·               Primavera P6 Professional, Aryana, 2013

·               Tendering(Procurement documents and proposals  preparation -ITB,RFQ and Bid), Aryana, 2013

·               Knowledge Management, Aryana, 2013

 

Computer Skills

·               Oracle Primavera P6 EPPM, Professional, and Client (9 Years)

·               Oracle Primavera Risk Management , PERT and Monte Carlo Simulation, What-If analysis (7 years)

·               Microsoft Project, Microsoft office suite(Word, Excel, PowerPoint, Visio) (9 years)

 

Work Eligibility

Permanent resident (Green card holder) of the U.S.



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

Permanent resident

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TX-Houston

Relocate:

Yes

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Advanced

Farsi

Fluent